Refit & Equipment

Here a little (unorganised) summary of all those things done or in need to be done to get Lady Rover truly shipshape.

Below some pictures of items fixed & added.

What still needs to be done:

  • Install a bimini
  • Add stackpack
  • Replace fridge
  • Mount desalinator
  • Mount an eyebrow on the salon roof
  • Mount one windscreen wiper
  • Genacker
  • Mount lifeline below bridgedeck
  • Text based sat email
  • Vents
  • Sunscreens
  • Gas calorifier
  • Gas heater
  • Relocate gas locker
  • Get liferaft
  • Get radar

 

What has been done so far:

  • Improved mainsheet system
  • New netting forward
  • Add second anchor
  • Added roller reefing Genoa
  • New main halyard with purchase
  • Red light in Navstation
  • Repaired centerboard system
  • Gas and carbonmonoxide alarm
  • New fuel tank
  • Add second engine
  • Built new outboard gondola with slide on starboard
  • Chafe patch at aft end of superstructure
  • Reinforce arch
  • Add anchor chain
  • NavPad & storage rack added
  • Repaint underwater
  • New brackets forward longitudinal beams
  • Reff line & halyard stoppers added
  • Reff line bags added
  • Sea anchor system added
  • Added genset
  • Reinforce aft deck
  • Refit rubrail
  • Fit new batteries
  • Install compass
  • Install AIS
  • Repaint deck
  • Repaint hull
  • Repair foward beam
  • Install storage nets
  • Install textile storage covers
  • Install boiler
  • Install shower
  • Install loudspeakers
  • Replace some sails
  • Install helmseats
  • Replace dinghy with sailing dinghy
  • Mount a windgen
  • Paint underwing orange
  • Replace Dyneema shrouds

 

CURRENT LOCATION:
CORDEMAIS (FRANCE)

Kind helpers:

Videos

Enlarge to watch!